Track Works – Laying the Foundation for Nation’s Rail Connectivity
Kiran Infra Engineering Limited (KIEL) is a leading name in track construction, linking, and renewal works across India’s vast rail network. With over 40 years of dedicated service to Indian Railways, RVNL, DFCCIL, IRCON, Metro Rail Corporations, and other infrastructure agencies, KIEL delivers unmatched expertise in track laying and commissioning with precision, quality, and safety at its core.
From ballast and non-ballast tracks to high-speed corridors and metro networks, we specialize in end-to-end permanent way (P-Way) works across greenfield, brownfield, and upgrade projects.
Our Track Work Services Include:
New Track Laying
- Track linking for BG, double-line, and DFC alignments
- Ballasted and ballastless track installation
- LWR, CWR, and SWR track construction
- Use of mechanized track laying machines (NTC, TRT, PQRS)
Points & Crossings Installation
- Laying and assembly of turnouts, scissors crossovers, SEJs
- Heavy-duty and fan-shaped turnouts for high-speed lines
- Ballast regulation and tamping around turnouts
Track Renewal & Maintenance
- Complete track renewal (CTR), through sleeper renewal (TSR), rail replacement
- Destressing of LWR/CWR, rail grinding and welding
- Ballast screening, leveling, and packing
- Tamping operations with tie-tampers and dynamic stabilizers
Metro & Urban Rail Systems
- Embedded rail systems, third rail installation
- Floating slab tracks for vibration-sensitive zones
- Ballastless track using precast and in-situ methods
- Gauge conversion and re-alignment works in urban corridors
Why KIEL for Track Works?
- IR & RDSO-Compliant Execution Standards
- Team of Experienced P-Way Engineers & Technicians
- Modern Mechanized Track Construction Equipment
- On-Time Completion with Safety & Precision
- Approved Vendor for Indian Railways, RVNL, and DFC
Major Track Work Projects Delivered
- Eastern & Western DFC track packages
- Metro rail track installation (Delhi, Jaipur, Ahmedabad)
- Indian Railways doubling and tripling projects
- High-speed rail & semi-high-speed corridors (underway)
Earthworks & Formation Services
At Kiran Infra Engineering Limited (KIEL), we offer end-to-end earthwork solutions for railway lines, highways, embankments, cuttings, and large-scale civil infrastructure. With four decades of engineering excellence, our earthwork division has been instrumental in shaping the foundation of national-level projects under Indian Railways, DFCCIL, RVNL, and State PWDs.
Whether it’s mass excavation, embankment formation, or subgrade preparation in challenging terrains, KIEL delivers quality, speed, and compliance-driven execution backed by modern machinery and expert manpower.
Our Earthwork Services Include:
Railway Formation Works
- Cutting & filling for new BG/Double Line/DFCCIL alignments
- Formation in soft, hard, and rocky strata
- Blanket material laying, compaction, and testing
- Turfing and slope protection for long-term stability
Road & Highway Embankments
- Embankment formation using borrow earth, fly ash, or GSB
- Soil stabilization using lime, cement, or geotextiles
- Construction of service roads and diversion roads
- Subgrade and sub-base preparation per MoRTH standards
Mass Excavation & Site Grading
- Large-scale bulk excavation with high-output equipment
- Grading, leveling, and contouring for industrial, metro, and utility sites
- Hill cutting and benching operations with safety protocols
Soil Improvement & Geo-solutions
- Mechanical compaction using vibratory rollers, plate compactors
- Ground improvement using sand drains, stone columns, and PVDs
- Retaining structures, toe walls, and geotextile applications
Why Choose KIEL for Earthworks?
- Fleet of Modern Earthmoving Equipment (excavators, dumpers, graders, vibratory rollers)
- Skilled Operators & On-Site Supervision
- Automated Leveling with Total Stations & GPS
- Tested Materials & Quality Assurance Systems
- Timely Execution in Coordination with Client Milestones
Track Record of Delivering Excellence
We have successfully completed earthworks in:
- Greenfield railway corridors (Eastern & Western DFC)
- Metro rail alignment formation
- Approach embankments for ROBs & RUBs
- Railway yard regrading & expansion
- Road embankment works under MoRTH & NHAI
Kiran Infra Engineers Limited
Our Iconic Projects
Bhima Bridge Project, South Western Railways
Bongaigaon-Agthori Bridge Project ,Northeast Frontier Railways
Pune Project,Central Railway BSU Line
KRIDE Project, Bengaluru
Rvnl Vijaywada Project
Kiran Infra Engineers Limited
Our Iconic Projects
SWR Bhima Bridge,(Karnataka)
ECOR Samastipur,(Bihar)